Job Reference
Casino Network Project 2015-2016
|
Job Reference
|
|||||||
|---|---|---|---|---|---|---|---|
|
Structure Cabling System:
|
Over 20,000 nodes, 7,000 cores infrastructure for Podium.
|
||||||
|
CCTV System:
|
Over 463,000m² coverage with more than 5000 cameras.
|
||||||
|
DNI:
|
Over 10,000 port patching and switches rack and stack for Data Center and Major ELV room.
|
||||||
Hotel DNI Project 2016-2018
|
Job Reference
|
|||||||
|---|---|---|---|---|---|---|---|
|
Structure Cabling System:
|
Over 10,000 nodes and 3,000 cores infrastructure for Hotel and Podium.
|
||||||
|
CCTV System:
|
Over 150,000m² coverage with more than 1200 cameras.
|
||||||
|
Wi-Fi System:
|
Over 150,000m² coverage with 2000 access points with full Wi-Fi coverage.
|
||||||
|
PABX System:
|
Over 1,500 Analogue phones and IP phones installation.
|
||||||
|
DNI:
|
Over 10,000 Port patching with switches rack and stack.
|
||||||
Casino WIFI System Upgrade Project 2018-2019
|
Job Reference
|
|||||||
|---|---|---|---|---|---|---|---|
|
Structure Cabling System:
|
Over 2,500 nodes new cabling and 1,500 nodes relocation at 5 floors Podium, 5 hotels and 7 slot clubs.
|
||||||
|
Wi-Fi System:
|
Over 650,000m² coverage with 4000 access points with full Wi-Fi coverage. Over 1,500 Analogue phones and IP phones installation.
|
||||||
Hotel BMS System 2008-2010
|
Job Reference
|
|||||||
|---|---|---|---|---|---|---|---|
|
BMS System:
|
Over 1,000 controls panels in Casino and Podium implementation. Over 3,000 sensors installation. Wiring system and conduit work. Secondment of over 30 skilled workers daily.
|
||||||
Casino Tetra and Mobile System Upgrade Project 2019-2020
|
Job Reference
|
|||||||
|---|---|---|---|---|---|---|---|
|
DAS TETRA System:
|
Over 650,000m² TETRA signal coverage with more than 2000 antennas.
|
||||||
|
DAS Mobile System:
|
Over 1000 hotel guest room mobile signal coverage with more than 3000 antennas.
|
||||||
General Overview
|
Project
|
Scope
|
|||
|---|---|---|---|---|
|
Casino Jai Alai
|
AV, PABX, SCS project deliver
|
|||
|
City of Dream
|
CCTV, IAS, SCS A&A works
|
|||
|
Duty Free Shop
|
People counting system, SCS project delivery
|
|||
|
Galaxy Mega Resort
|
Cabling System for Security Access Control System
|
|||
|
Grand Lisboa
|
TETRA Antenna System
|
|||
|
Macau International Airport
|
BMS, Energy Saving system, TV wall installation
|
|||
|
One Macau Centre
|
ELV maintenance works
|
|||
|
Planet J – Sands Cotai
|
SCS implement
|
|||
|
Wynn Resort
|
Access point installation
|
|||
|
摩卡 Mocha
|
CCTV, SCS, WIFI, AV
|
|||
|
Grand Coloane Resort
|
CCTV, SCS
|
|||
|
氹仔街市擴建工程Mercado Municipal da Taipa Extension
|
CCTV, SAC, SCS, PA, DISABLE TOILETTE, SECURITY PETROL SYSTEM
|
|||